Slade Green
At Slade Green Depot for Southeastern Railway we had the challenge of integrating CCTV cameras located 500m away from the maintenance depot. Following site risk assessment we future proofed the site by installing and commissioning an IP based System including Bosch multi-functional cameras and NVR’s, to replace redundant Analogue equipment.
As part of the assessment we designed out significant lengths of run by Slade Green Depot has one of the largest footprints in the South East, as such it had extreme cable runs with difficult to reach locations. As a result, we installed cost-effective solution to run the data from network video surveillance cameras we chose a point to point InfiNet wireless solution. This would have taken considerable time to arrange for the appropriate safe systems of work and line isolations. By deploying the wireless method, we avoided extensive cabling and civil works along the side of the track.